In 1986 Ansaldo Magnet Dept. (now ASG Superconductors) started, in cooperation with CERN, the design activities of the first 1 m-8 T LHC prototype dipoles. After several design steps and the manufacturing of 1 $+$3 prototype dipoles 10 m long, the final design configuration 15 m long was defined by CERN. During the following years, a very close collaboration with CERN engineers and technicians lead to define the parameters about the most critical manufacturing processes, in particular winding of s.c. cable, collaring of coils, cold mass welding and test procedures.
展开▼