首页> 外文期刊>Applied Energy >CO_2 payback-time assessment of a regional-scale heating and cooling system using a ground source heat-pump in a high energy-consumption area in Tokyo
【24h】

CO_2 payback-time assessment of a regional-scale heating and cooling system using a ground source heat-pump in a high energy-consumption area in Tokyo

机译:在东京高能耗地区使用地源热泵对区域规模供热和制冷系统进行CO_2投资回收期评估

获取原文
获取原文并翻译 | 示例
           

摘要

We present an assessment of installing a regional heating and cooling system in the Nishi(West)-Shinjuku area of Tokyo, Japan. In this assessment, we estimate the CO_2 payback- Time, when air source heat-pumps(ASHP)are replaced with a ground-source heat-pump (GSHP)system. We calculated CO_2 emissions from transportation of the cooling tower, materials for the underground heat exchanger, and the digging loads and transportation loads incurred when the GSHP system is installed to replace the air source cooling system. The total CO_2 emission from the installation of the GSHP system was estimated to be 67,710t-CO_2, with 87/100 of the CO_2 emission resulting from the digging process.
机译:我们提出了在日本东京的西(西)新宿地区安装区域供热和制冷系统的评估。在此评估中,我们估计了用地源热泵(GSHP)系统代替空气源热泵(ASHP)时的CO_2回收期。我们计算了冷却塔的运输,地下热交换器的材料以及安装GSHP系统代替空气源冷却系统时产生的挖掘负荷和运输负荷的CO_2排放量。 GSHP系统安装后的总CO_2排放量估计为67,710t-CO_2,其中87/100的CO_2排放量来自于挖掘过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号