首页> 外文期刊>Applied Energy >Upgrading existing coal-fired power plants through heavy-duty and aeroderivative gas turbines
【24h】

Upgrading existing coal-fired power plants through heavy-duty and aeroderivative gas turbines

机译:通过重型和航改燃气轮机升级现有的燃煤电厂

获取原文
获取原文并翻译 | 示例
           

摘要

The need to meet future changes in power demand and current environmental regulations are considered the main driving forces for upgrading existing coal-fired power plants. In this context, repowering by gas-turbine integration is a well-established technique to increase power plant capacity and operational flexibility. Non-negligible benefits are also improvements in efficiency and a decrease in greenhouse gases emissions promoted by the shift to low carbon fuels.
机译:满足未来电力需求变化和当前环境法规的需求被认为是升级现有燃煤电厂的主要动力。在这种情况下,通过燃气轮机集成进行供电是一项成熟的技术,可以提高电厂的产能和运营灵活性。不可忽视的好处还包括效率的提高和因转向低碳燃料而导致的温室气体排放量的减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号