...
首页> 外文期刊>Applied Energy >Design of a combined power, heating and cooling system at sized and undersized configurations for a reference building: Technoeconomic and topological considerations in Iran and Italy
【24h】

Design of a combined power, heating and cooling system at sized and undersized configurations for a reference building: Technoeconomic and topological considerations in Iran and Italy

机译:为参考建筑物设计尺寸和尺寸偏小的组合式电力,供暖和制冷系统:伊朗和意大利的技术经济和拓扑考虑

获取原文
获取原文并翻译 | 示例
           

摘要

The objective of the present paper is sizing of a technically optimum and economically feasible cogeneration system to supply heating, cooling and electricity to a reference building in the city of Pisa, Italy, for different months of the year. This cogeneration system is proposed in two operational modes, sized and under-sized, so that the effect of natural gas and electricity consumption costs on the system design can be achieved. To this end, the amount of energy consumption and cost of various types of the proposed cogeneration systems based on reciprocating engines are computed and compared. Afterward, in the proposed systems, for understanding the effect of the costs of the energy carriers in different countries on the rate of payback period, a comparison is conducted on the payback period between Iran and Italy. In the end, a sensitivity analysis is performed in Iran and Italy to survey the effect of any change in the cost of investment, natural gas, and electricity on the payback period. The results indicated that although the costs of gas and electricity are comparatively lower, the payback period is longer for Iran, which can be blamed on Irans higher discount rate (similar to 50%). The results of sensitivity analysis showed that if the natural gas cost in Italy equals that of Iran, there would be a 6.4% reduction in the payback period and if the electricity cost consumption in Iran is taken equivalent to the cost of electricity in Italy, a decrease of 25% will appear in the payback period.
机译:本文的目的是确定技术上最佳且经济上可行的热电联产系统的规模,以在一年中不同月份向意大利比萨市的参考建筑物提供供热,制冷和电力。该热电联产系统以尺寸和尺寸过小的两种运行模式提出,因此可以实现天然气和电力消耗成本对系统设计的影响。为此,计算并比较了各种类型的提议的基于往复式发动机的热电联产系统的能耗和成本。然后,在拟议的系统中,为了了解不同国家的能源载体成本对投资回收期的影响,对伊朗和意大利之间的投资回收期进行了比较。最后,在伊朗和意大利进行了敏感性分析,以调查投资,天然气和电力成本的任何变化对投资回收期的影响。结果表明,尽管天然气和电力成本相对较低,但伊朗的投资回收期较长,这可以归因于伊朗较高的贴现率(约50%)。敏感性分析的结果表明,如果意大利的天然气成本等于伊朗的天然气成本,则投资回收期将减少6.4%,并且如果伊朗的电力成本消耗与意大利的电力成本相等,则投资回收期将减少25%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号