...
首页> 外文期刊>Energy sources >Iranian energy price policy for optimal size and operation of gas production systems used in a combined cooling, heating, and power system
【24h】

Iranian energy price policy for optimal size and operation of gas production systems used in a combined cooling, heating, and power system

机译:伊朗能源价格政策,用于在制冷,供暖和电力系统组合中使用的天然气生产系统的最佳尺寸和运行

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Greenhouse gases (Gags) are one of the main reasons behind the Earth warming. In Iran, the majority of power plants utilize fossil fuels for generating electricity. And also, the production of Gags from the fossil fuels is very high. Gas production system (GPS) is found to be a good candidate for lowering the amount of Gags produced. Therefore, in this study, the optimal size and operation of different GPSs used in a combined cool, heat, and power system are investigated. Particle swarm optimization algorithm is used for optimization. The results show that the sewage sludge GPS with reciprocating engine (RE) has the lowest payback period. In addition, the RE has the highest pollution cost under the condition of selling electricity to the electrical network.
机译:温室气体是造成地球变暖的主要原因之一。在伊朗,大多数发电厂都使用化石燃料发电。而且,由化石燃料生产的堵嘴烟的产量很高。天然气生产系统(GPS)被发现是降低产生的Gags数量的理想选择。因此,在这项研究中,研究了在制冷,供热和电力系统组合中使用的不同GPS的最佳尺寸和操作。使用粒子群优化算法进行优化。结果表明,带有往复式发动机(RE)的污水污泥GPS的投资回收期最短。另外,在向电网出售电力的条件下,可再生能源具有最高的污染成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号