Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment

机译:在多模式项目计划环境中,铁路计划减少了预期的项目完成时间,超过了路行者计划

获取原文
获取原文并翻译 | 示例
       

摘要

The Critical Chain Scheduling and Buffer Management (CC/BM) methodology, proposed by Goldratt (Critical chain, 1997), introduced the concepts of feeding buffers, project buffers and resource buffers as well as the roadrunner mentality. This last concept, in which activities are started as soon as possible, was introduced in order to speed up projects by taking advantage of predecessors finishing early. Later on, the railway scheduling concept of never starting activities earlier than planned was introduced as a way to increase the stability of the project, typically at the cost of an increase in the expected project makespan. In this paper, we will indicate a realistic situation in which railway scheduling improves both the stability and the expected project makespan over roadrunner scheduling.
机译:Goldratt(Critical chain,1997)提出的关键链调度和缓冲区管理(CC / BM)方法介绍了馈送缓冲区,项目缓冲区和资源缓冲区的概念以及走行者的思想。引入了最后一个概念,即尽快开始活动,以利用早期完成的优势来加速项目。后来,引入了铁路调度概念,即从不比计划提前开展活动,这是增加项目稳定性的一种方法,通常以增加预期项目工期为代价。在本文中,我们将指出一个现实情况,即铁路调度既可以提高稳定性,又可以提高预期的工程量,而不是行车时间安排。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号