An estimation of an uncertainty caused by a direct propagation of the Level 1 ET sequence cut sets into the Level 2 risk

机译:由1级ET序列切割的直接传播导致的不确定性的估计集进入2级风险

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

While the current risk-informed framework for a Level 2 PSA requires a complete transfer of all the Level 1 ET sequence information into the relevant PDSs (or Level 2 risk metrics), most practices on the PDS binning process often show an inconsistency between the Level 1 CDF and the Level 2 risk although both values must be theoretically the same in that case. Clarification of the foregoing issue is crucial since the PDS-related uncertainty analysis is a starting point of the Level 2 risk analysis and consequently whose portion is directly transferred to the Level 2 risk metrics. For this, a plant-specific impact of an analyst's different choice (or criteria) of the PDS definition has been analyzed with the way the Level 1 ET sequence cut sets are directly linked with the relevant PDSs during the Level 1/2 binning process. The present result shows that the foregoing difference is mainly caused by a combined impact of two competing uncertainty sources; (1) one source is a decrease of the PDS frequency due to a truncation limit and (2) the other source is its increase due to extra independent cut sets generated in the direct linking process of the Level 1 ET sequence cut sets with the relevant PDSs. From the numerical viewpoint, the plant-specific contribution of an uncertainty caused by the current Level 1/2 binning process to the Level 2 risk ranges from -1.2% to 2.5% of the Level 1 CDF value, consequently leading to the corresponding contribution to the Level 2 risk uncertainty.
机译:尽管当前针对第2级PSA的具有风险意识的框架要求将所有第1级ET序列信息完全转移到相关的PDS(或第2级风险指标)中,但大多数PDS分箱过程中的实践通常显示出各级之间的不一致1 CDF和2级风险,尽管在这种情况下,两个值在理论上必须相同。澄清上述问题至关重要,因为与PDS相关的不确定性分析是2级风险分析的起点,因此其部分直接转移到2级风险指标。为此,已使用第1级ET序列切割集在第1/2级装仓过程中与相关PDS直接链接的方式,分析了分析师对PDS定义的不同选择(或标准)对工厂的特定影响。目前的结果表明,上述差异主要是由两个相互竞争的不确定性源的综合影响引起的。 (1)一个来源是由于截断限制而导致PDS频率降低,(2)另一个来源是由于在1级ET序列切割集与相关的直接链接过程中生成的额外独立切割集而导致PDS频率增加PDS。从数值角度来看,由当前的1/2级装箱过程导致的不确定性对2级风险的工厂特定贡献范围为1级CDF值的-1.2%至2.5%,因此导致对2级风险不确定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号