...
首页> 外文期刊>The American Oil & Gas Reporter >Bj Services Introduces Unit For Deepwater Cementing
【24h】

Bj Services Introduces Unit For Deepwater Cementing

机译:Bj Services推出深水固井装置

获取原文
获取原文并翻译 | 示例

摘要

Services Co. reports it has developed a new-generation, high-performance Seahawk~(TM) cementing unit for installation onboard the PS1 drillship for BP operations in the Gulf of Mexico.rnPride International's new drillship is expected to begin operations in the ultra-deepwater sector during the third quarter of 2010, BJ reports. According to the company, adding the high-horsepower Seahawk cementing unit to its fleet provides operators with an unprecedented range of performance capabilities for offshore cementing, including faster mixing rates for high-volume tophole cementing, faster displacement rates, and greater redundancy and backup capability.rn"We are excited about the advanced capabilities of the new-generation Seahawk cementing unit and the opportunities it provides in the exploration and development of ultra-deepwater reserves," says BJ Services Chief Operating Officer David Dunlap. "When needed, this high-power model can achieve blending rates to 20 barrels a minute for ultradeep zone iso-lation and related displacement tasks."
机译:服务公司报告说,它已经开发了新一代高性能Seahawk〜(TM)固井装置,可安装在PS1钻井船上,用于墨西哥湾的BP作业。rnPride International的新型钻井船有望在超大型钻井平台上开始作业。 BJ报告称,2010年第三季度的深水行业。据该公司称,在其船队中增加了大功率海鹰固井装置,为运营商提供了前所未有的海上固井性能范围,包括更快的大体积顶孔固井混合速度,更快的驱替速度以及更大的冗余和备用能力Brn服务首席运营官David Dunlap说:“我们对新一代Seahawk固井设备的先进功能及其在勘探和开发超深水储量方面所提供的机遇感到兴奋,” “在需要时,这种高功率模型可以实现超深区隔离和相关置换任务的混合速率达到每分钟20桶。”

著录项

  • 来源
    《The American Oil & Gas Reporter 》 |2009年第4期| 203-203| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号