...
首页> 外文期刊>American cranes & transport >Crawlers perform on Ice Mountain
【24h】

Crawlers perform on Ice Mountain

机译:爬行者在冰山上表演

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Lomma Crane & Rigging dispatched two crawlers, a Manitowoc 18000 and a Manitowoc 2250, to assist with wind turbine erection at Sandy Ridge Wind Farm in Tyrone, PA. The cranes erected 25 Gamesa G87 wind turbines at the wind farm that tower up to 330 feet. While erecting wind turbines is tough work, this job got even more complicated due to frigid winter temperatures, powerful winds and mounds of snow, according to the company. Steve Burkholder, Lomma's heavy lift manager at its Pittsburg, Pa., location, said the Manitowoc cranes handled the job with ease.
机译:Lomma Crane&Rigging派出了两台履带车,一台Manitowoc 18000和一台Manitowoc 2250,以协助宾夕法尼亚州泰隆市的桑迪里奇风电场架设风力涡轮机。起重机在风力发电场架设了25台Gamea G87风力涡轮机,其最高高度为330英尺。该公司表示,虽然安装风力涡轮机是一项艰巨的工作,但由于严寒的冬季温度,强劲的风和成堆的雪,这项工作变得更加复杂。 Lomma在宾夕法尼亚州匹兹堡的位置的重型电梯经理Steve Burkholder说,Manitowoc起重机轻松完成了这项工作。

著录项

  • 来源
    《American cranes & transport》 |2013年第8期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号