首页> 外文期刊>Directory of administrative services >Job Order Contracting process speeds emergency highway repairs in Arizona
【24h】

Job Order Contracting process speeds emergency highway repairs in Arizona

机译:工单签约流程加快了亚利桑那州的紧急公路维修

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A 200-year monsoon dumped as much as 1.7 inches of rain on House Rock Valley, Ariz., in August 2015. Torrents of water damaged the roadway and culvert system designed to channel flash-flood rains under the highway. When skies cleared, the Arizona Dept. of Transportation (ADOT) was tasked with removing tons of sediment that ranged from silt to 15-foot-diameter boulders so repairs to the roadway and drainage system could be completed.
机译:在2015年8月,一个200年的季风在亚利桑那州的House Rock Valley倾泻了多达1.7英寸的雨水。洪流破坏了道路和涵洞系统,该系统旨在引导高速公路下方的暴雨。当天空晴朗时,亚利桑那州交通运输部(ADOT)的任务是清除吨淤泥,淤泥范围从淤泥到直径15英尺的巨石,以便完成道路和排水系统的维修。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号