首页> 外文期刊>Airways >DOING IT DIFFERENTLY IN THE GULF
【24h】

DOING IT DIFFERENTLY IN THE GULF

机译:在湾中进行的操作不同

获取原文
获取原文并翻译 | 示例
           

摘要

Flights are still handled at the small, old terminal, and they are not docked at airbridges, because there are none. Instead, gangways are attached to the aircraft, and travelers step outside into the often oppressive heat and humidity before taking bused to the arrivals building. And this building hasn't changed much since it opened in 1973. It's quite a deja-vu for Oman Air CEO Paul Gregorowitsch, the 59-year-old Dutch airline executive who served as the Chief Operational Officer (COO) of Air Berlin (AB) in Germany from 2011 to 2013, before taking the top job in Muscat in August 2014. Air Berlin's major challenge was-and still is-the unopened new Berlin Brandenburg International Airport (BER), which was due to come online in 2012, but is now slated for late 2017. That also happens to be the revised target date for the new Muscat facility, which was delayed for much the same reasons as BER: being only partly finished, having insufficient installations in the terminal interiors, and facing hiccups with contractors.
机译:航班仍在旧的小型航站楼中处理,它们没有停靠在机场桥上,因为那里没有人。取而代之的是,将舷梯固定在飞机上,旅客在乘搭公共汽车到达到达大楼之前便走到经常闷热难耐的高温和潮湿环境中。自从1973年开业以来,这座建筑并没有太大变化。对于阿曼航空首席执行官Paul Gregorowitsch(这位现年59岁的荷兰航空公司高管,曾任柏林航空首席运营官(COO))来说,这简直就是巧合。 AB)于2011年至2013年在德国工作,然后于2014年8月在马斯喀特(Muscat)担任最高职位。柏林航空的主要挑战是-仍然是-未开放的新柏林勃兰登堡国际机场(BER),该机场将于2012年上线,但现在定于2017年下半年。这恰好是新的马斯喀特工厂的修订目标日期,由于与BER大致相同的原因而被推迟:仅部分完成,终端内部的安装不足,面临打h与承包商。

著录项

  • 来源
    《Airways》 |2016年第3期|22-27|共6页
  • 作者

    ANDREAS SPAETH;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号