...
【24h】

Argyle Update

机译:亚皆老街更新

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of the new Argyle International Airport on the island of St Vincent in the Caribbean continues with the runway and earthworks now 85% complete. While the state-of-the-art terminal building is structurally fin- ished, it has a stainless steel insulated roof, specifically designed to keep the building cool and lessen the use of air conditioning. Large expanses of glass are being used for the external walls to allow natural light into the departure and arrival halls. The building is scheduled to be completed by the end of the year, after which the internal fit process can begin. All construction is due to be finished by next July.
机译:继续在加勒比海的圣文森特岛上建造新的阿盖尔国际机场,目前跑道和土方工程已完成85%。先进的候机楼在结构上已完成,但它具有一个不锈钢隔热屋顶,专门设计用于使大楼保持凉爽并减少空调的使用。大面积的玻璃被用于外墙,以使自然光进入出发大厅和到达大厅。该建筑计划于今年年底完工,然后可以开始内部装修流程。所有施工将于明年七月完成。

著录项

  • 来源
    《Airliner World》 |2013年第10期|17-17|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号