首页> 外文期刊>Airforces Monthly >First Block 8.1 HC-130J for US Coast Guard
【24h】

First Block 8.1 HC-130J for US Coast Guard

机译:美国海岸警卫队第一座8.1 HC-130J

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

LOCKHEED MARTIN has delivered a first HC-130J outfitted with the Block 8,1 upgrade to the US Coast Guard. The Hercules was handed over in a ceremony at the Coast Guard Aviation Logistics Center in Elizabeth City, North Carolina, on January 31, after operational testing of aircraft was completed. This upgrade was installed on a previously delivered HC-130J at Lockheed Martin's facility in Greenville, South Carolina. The company is currently contracted to deliver at least six Block 8.1 upgrade kits to the USCG.
机译:洛克希德·马丁公司已经交付了第一架配备了Block 8,1的HC-130J,并将其升级为美国海岸警卫队。飞机的运行测试完成后,大力神于1月31日在北卡罗来纳州伊丽莎白市海岸警卫队航空物流中心举行的仪式上移交了飞机。此升级安装在洛克希德·马丁公司在南卡罗来纳州格林维尔的工厂先前交付的HC-130J上。目前,该公司已签约向USCG提供至少六个Block 8.1升级套件。

著录项

  • 来源
    《Airforces Monthly》 |2020年第384期|17-17|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号