首页> 外文期刊>Airforces Monthly >'3 Amigos' F-16 upgrades completed at Hill
【24h】

'3 Amigos' F-16 upgrades completed at Hill

机译:在希尔完成“ 3 Amigos” F-16升级

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A FINAL F-16 has been redelivered to the USAF after undergoing work on the so-called '3 Amigos' modification line, run by the 573rd Aircraft Maintenance Squadron (AMXS) at the Ogden Air Logistics Complex, Hill Air Force Base, Utah. A first F-16 modified was completed in March 2013 and the programme provided three structural Time Compliance Technical Order modifications and incorporated modifications including updates to the centre display unit, helmet-mounted integrated targeting and beyond line-of sight communication. The first F-16 modified was completed in March 2013. At the height of production, 18 aircraft were on the line at one time. In total, more than 300 F-16s received the modifications, including 24 Foreign Military Sales aircraft for the Indonesian Air Force. During the life of the programme, the workload evolved from inspecting and doing minor repairs at an average of 1,795 hours to more elaborate repairs that included replacing bulkhead segments, which increased the average hours by 59% to 2,863 hours.
机译:在由犹他州希尔空军基地奥格登空中物流中心的第573飞机维修中队(AMXS)进行所谓的“ 3 Amigos”改装生产线工作之后,最后一架F-16已交付给美国空军。第一架F-16改装机已于2013年3月完成,该计划提供了三项结构性的“时间合规性技术订单”修改,并进行了修改,包括对中央显示单元的更新,头盔式集成瞄准器以及视线之外的通信。首架F-16改装机于2013年3月完成。在生产高峰时,一次有18架飞机在生产线上。总共有300多架F-16接受了改装,其中包括24架用于印尼空军的外国军售飞机。在该方案的整个生命周期中,工作量从平均检查和进行小修(平均1,795小时)发展到更精细的维修(包括更换舱壁部分),平均工作时间增加了59%,达到2,863小时。

著录项

  • 来源
    《Airforces Monthly》 |2019年第371期|15-15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号