...
首页> 外文期刊>Air Pollution Consultant >PSD Permitting Violations May Not Be Subject to the Statute of Limitations If Wrongdoing Occurred
【24h】

PSD Permitting Violations May Not Be Subject to the Statute of Limitations If Wrongdoing Occurred

机译:如果发生错误,则PSD允许的违规行为可能不受限制法规的约束

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In the March 30,2012 decision, the district court concluded that Cemex was not entitled to summary judgment on the statute of limitations issue, as the limitations period can be tolled if it is found that the company concealed wrongdoing. However, the court granted Cemex summary judgment on EPA's claims that failure to obtain the contested preconstruction permits was also a violation of Tide V requirements.
机译:在2012年3月30日的裁决中,地方法院裁定Cemex无权就诉讼时效问题进行简易判决,因为如果发现公司隐瞒不法行为,可以限制诉讼时效。但是,法院批准了Cemex对EPA的指控的即决判决,即未获得有争议的施工前许可证也违反了Tide V的要求。

著录项

  • 来源
    《Air Pollution Consultant》 |2012年第5期|p.3.6-3.8|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号