首页> 外文期刊>Air International >Boeing Starts 787-9 Assembly While Talks Continue about 787-10X
【24h】

Boeing Starts 787-9 Assembly While Talks Continue about 787-10X

机译:波音开始787-9组装,而有关787-10X的讨论仍在继续

获取原文
获取原文并翻译 | 示例
           

摘要

Assembly of the first Boeing 787-9 Dreamliner is due to start in the first few weeks of 2013. Pat Shanahan, Vice-President of Airplane Programs of Boeing Commercial Airplanes, recently said three forward fuselage sections and wing spars for the new variant of the Dreamliner were nearing completion with sub-contractor Kawasaki Heavy Industries at Nagoya in Japan (further to 787-9 Assembly Starts, October 2012, p26). The initial Section 43 fuselage barrel will be transported to North Charleston, South Carolina, for further work before going to the production line at Everett, Washington. First flight of the 787-9 is planned for June 2013 and service entry with Air New Zealand in early 2014.
机译:首架波音787-9 Dreamliner飞机的组装工作将于2013年的前几周开始。波音民用飞机公司飞机项目副总裁Pat Shanahan最近表示,新的波音787的三个前机身部分和机翼翼梁Dreamliner与日本名古屋的分包商川崎重工(Kawasaki Heavy Industries)接近完成(距离787-9组装开始,2012年10月,第26页)。最初的Section 43机身桶将被运送到南卡罗来纳州的北查尔斯顿,进行进一步的工作,然后再前往华盛顿埃弗里特的生产线。 787-9计划于2013年6月首飞,并于2014年初开始为新西兰航空提供服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号