首页> 外文期刊>Air International >Luftwaffe Eurofighters Bouncing Back?
【24h】

Luftwaffe Eurofighters Bouncing Back?

机译:德国空军的欧洲战斗机反弹了吗?

获取原文
获取原文并翻译 | 示例
           

摘要

It took exactly 10 years from the maiden flight of the first German Eurofighter Development Aircraft, DA1, on March 27, 1994, to the delivery of two-seaters for the primary operational German Air Force unit on April 26, 2004.rnOriginally the German Eurofighter programme comprised 180 aircraft, divided into three major production runs, know as tranches, and with projected delivery until 2017.rnTranche 1 entered production in 2002 with air-to-air capability achieved under the Block 2 aircraft configuration. All Eurofighters delivered in April and May 2004 already possessed the in-flight refuelling package, changes to the electrical system and a software update.
机译:从1994年3月27日德国第一架欧洲战斗机发展飞机DA1首次飞行到2004年4月26日为主要的德国空军部队交付两个座位的飞机,整整花了10年的时间。该计划包括180架飞机,分为三个主要生产阶段,称为批次,预计到2017年交付。rn第1批次于2002年开始生产,在Block 2飞机配置下实现了空对空能力。 2004年4月和2004年5月交付的所有欧洲战斗机都已经拥有机上加油包,电气系统变更和软件更新。

著录项

  • 来源
    《Air International》 |2010年第4期|p.66-73|共8页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号