首页> 外文期刊>Air Conditioning, Heating & Refrigeration News >In Geothermal Designs, Don't Succumb to Rules of Thumb
【24h】

In Geothermal Designs, Don't Succumb to Rules of Thumb

机译:在地热设计中,不要屈服于经验法则

获取原文
获取原文并翻译 | 示例
           

摘要

Generous federal tax credits, coupled with the desire to reduce energy costs without sacrificing comfort, have encouraged many homeowners to purchase geothermal heat pumps (GHPs) over the last several years. As customer interest has increased, numerous HVAC contractors have begun offering GHPs as a way to expand their businesses and give their customers another energy-efficient HVAC option. While many of these contractors have undergone extensive training and took the time to properly design and install their GHP systems, others may not have been so careful. The result has been some disgruntled customers who say that their systems do not produce enough heat in the winter and/or cooling in the summer. In many cases, the poor design and/or installation could have been avoided if the contractors had taken advantage of the numerous training opportunities offered by GHP manufacturers.
机译:过去几年来,慷慨的联邦税收抵免,以及在不牺牲舒适性的情况下降低能源成本的愿望,已经鼓励了许多房主购买地热热泵(GHP)。随着客户兴趣的增加,许多HVAC承包商已开始提供GHP,以扩展业务并为客户提供另一种节能的HVAC选项。尽管许多承包商都接受了广泛的培训,并花了一些时间来正确设计和安装他们的GHP系统,但其他承包商可能并没有那么小心。结果是一些不满的客户表示,他们的系统在冬天不能产生足够的热量,在夏天不能产生足够的热量。在许多情况下,如果承包商利用了GHP制造商提供的大量培训机会,则可以避免设计和/或安装不佳。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号