...
首页> 外文期刊>IIE Transactions >An efficient priority rule for scheduling job shops to minimize mean tardiness
【24h】

An efficient priority rule for scheduling job shops to minimize mean tardiness

机译:一个有效的优先级规则,用于安排作业车间以最大程度地减少平均拖延

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The ability to respond quickly to customer demands is a key factor in successfully competing in today's globally competitive markets. Thus, meeting due dates could be the most important goal of scheduling in many manufacturing and service industries. Meeting due dates can naturally be translated into minimizing job tardiness. In this paper we present a priority rule for dynamic job shop scheduling that minimizes mean job tardiness. The rule is developed based on the characteristics of existing dispatching rules. With job due dates set by the generalized total work content rule, the computational results of simulation experiments show that the proposed dispatching rule consistently, and often, significantly outperforms a number of well-known priority rules in the literature. The proposed rule is also robust being the best or near-best rule for reducing the mean flowtime, for all the shop load levels and due date tightness factors tested.
机译:快速响应客户需求的能力是在当今全球竞争激烈的市场中成功竞争的关键因素。因此,在许多制造业和服务业中,满足到期日可能是最重要的调度目标。满足到期日自然可以转化为最大限度地减少工作延迟。在本文中,我们提出了动态作业车间调度的优先级规则,该规则可最大程度地减少平均作业延迟。该规则是根据现有调度规则的特征开发的。利用广义总工作内容规则设定的工作到期日,模拟实验的计算结果表明,所提出的调度规则始终如一,并且通常明显优于文献中的许多众所周知的优先级规则。对于所有车间负荷水平和所测试的到期日密封性因素,所建议的规则也是健壮的,它是减少平均流动时间的最佳或接近最佳的规则。

著录项

  • 来源
    《IIE Transactions》 |2006年第9期|p.789-795|共7页
  • 作者

    M.X. Weng; H. Ren;

  • 作者单位

    Department of Industrial and Management Systems Engineering, University of South Florida, Tampa, FL 33620, USA;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 一般工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号