首页> 外文期刊>IIE Transactions >The design of mission-based component test plans for series connection of subsystems
【24h】

The design of mission-based component test plans for series connection of subsystems

机译:子系统串联的基于任务的组件测试计划的设计

获取原文
获取原文并翻译 | 示例
           

摘要

This article analyzes the mission-based component testing problem of devices which consist of series connection of 1-out-of-M subsystems or series connection of m-out-of-« subsystems. The device is designed to perform a mission that has a random sequence of phases with random durations. It is assumed that the deterioration of the components of the system is modulated by the mission process in such a way that the component failure rates depend on the phase that is performed. The objective is to find optimal component test times that yield desired levels of system reliability. An algorithmic procedure that is based on a column generation technique and d.c. programming is presented. This procedure eventually solves a semi-infinite linear program and it is illustrated by numerical examples. The existence of optimal component test times is discussed and sufficient conditions for the feasibility of the underlying semi-infinite linear programming model are determined.
机译:本文分析了设备的基于任务的组件测试问题,这些问题包括M出1个子系统的串联连接或M出个子系统的串联连接。该设备旨在执行任务,该任务具有带有随机持续时间的随机相位序列。假定系统的组件的恶化是由任务过程以某种方式调节的,即组件故障率取决于执行的阶段。目的是找到可以达到期望的系统可靠性水平的最佳组件测试时间。一种基于列生成技术和dc的算法过程。介绍编程。此过程最终解决了一个半无限线性程序,并通过数值示例进行了说明。讨论了最佳组件测试时间的存在,并确定了用于基础半无限线性规划模型的可行性的充分条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号