首页> 外文期刊>Africa energy intelligence >Total and Thierry Tanoh clash over LNG project
【24h】

Total and Thierry Tanoh clash over LNG project

机译:道达尔和蒂埃里·塔努(Thierry Tanoh)就液化天然气项目发生冲突

获取原文
获取原文并翻译 | 示例
           

摘要

After being announced with great pomp inrn2017, French group Total’s floating storagernregasification unit (FSRU) in the port of Abidjanrnis being blocked by Ivorian minister of oilrnThierry Tanoh. The estimated €150 millionrninvestment will be used to supply 3 millionrntonnes of gas to the Ivorian economic capital’srnthermal power plants. The reason for therndelay boils down to economics. According tornour sources, Tanoh is offering between $5.5rnand $6 per million MMBtu, while Total wantsrn$7 per million MMBtu. The French major hasrnurged Prime Minister Amadou Gon Coulibalyrnto reopen the negotiations. Total has severalrnpartners on the project: Shell, Azerbaijanirnnational company Socar, American firmrnEndeavor and Ivorian groups Petroci andrnCI-Energies. These firms formed the jointrnventure Cote d’Ivoire-GNL headed by Frenchrnnational Remi Duchateau ( AEI 800).
机译:法国集团道达尔(Total)在阿比让尼斯(Abidjanrnis)港口的浮动储存气化装置(FSRU)在2017年大获成功后宣布,遭到科特迪瓦石油部长蒂埃里(Thierry Tanoh)的封锁。估计的1.5亿欧元投资将用于向科特迪瓦经济首都的热电厂提供300万吨天然气。延迟的原因归结为经济学。根据rnour的消息来源,Tanoh的报价为每百万MMBtu 5.5美元至6美元,而Total希望每百万MMBtu 7美元。法国少校敦促总理阿马杜·贡·库利巴利恩重启谈判。道达尔在该项目上有几个合作伙伴:壳牌,阿塞拜疆国民公司Socar,美国恩迪沃公司和科特迪瓦集团Petroci andrnCI-Energies。这些公司组成了以法国国民Remi Duchateau(AEI 800)为首的科特迪瓦-GNL合资企业。

著录项

  • 来源
    《Africa energy intelligence》 |2018年第819期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号