首页> 外文期刊>Africa energy intelligence >Minergy Coal gets off to difficult start amid South African lockdown
【24h】

Minergy Coal gets off to difficult start amid South African lockdown

机译:在南非锁模中,矿山逃到困难的开始

获取原文
获取原文并翻译 | 示例
           

摘要

The coronavirus crisis has disrupted the best-laid plans of Botswana's Minergy Coal, which owns the Masama coal project located some 70 km north of Gaborone. The mine went into production in the summer of 2019, but the junior run by the South African Morné Du Plessis has had to revise down its production forecasts and is now aiming to mine just 60,000 tonnes of coal a month. Prior to the pandemic, Minergy had expected to achieve its monthly target of 80,000 tonnes a month by July, 90% of which was earmarked for export to neighbouring South Africa.
机译:Coronavirus危机已经扰乱了博茨瓦纳的矿物煤炭最佳计划,该煤炭拥有玛萨马煤项目位于戈德罗北部约70公里处。矿井于2019年夏天进入生产,但南非南部的初级经营不得不修改其生产预测,现在旨在每月挖掘60,000吨煤炭。在大流行之前,Minergy预计将在7月份每月达到每月8万吨,其中90%被指定用于出口到邻国南非。

著录项

  • 来源
    《Africa energy intelligence》 |2020年第24期|11-12|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号