...
首页> 外文期刊>Advances in civil engineering >Resource Unconstrained and Constrained Project Scheduling Problems and Practices in a Multiproject Environment
【24h】

Resource Unconstrained and Constrained Project Scheduling Problems and Practices in a Multiproject Environment

机译:多项目环境中的资源不受约束和受约束的项目计划问题和实践

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Construction companies execute many projects simultaneously. In such situations, the performance of one project may influence the others positively or negatively. Construction professionals face difficulties in managing multiple projects in limited resource situations. The purpose of this study is to identify the problems in multiproject scheduling from the practitioner's perspective and to discover current practices under resource unconstrained and constrained settings. The specific objectives are (1) determining the most challenging issues being faced in handling multiproject environment, (2) enumerating the practices adopted in the industry, and finally (3) identifying the practitioners' perceptions on the multiproject scheduling aspects such as network modeling approaches; activity execution modes; concept of sharing, dedicating, and substituting resources; centralized and decentralized decision-making models; solution approaches; and tools and techniques. An online questionnaire survey was conducted to address the objectives above. The top challenging issues in managing multiproject environment are identified. Factor analysis identified the factors by grouping the variables (a) decision-related, (b) project environment-related, (c) project management-related, and (d) organization-related factors. Resource-unconstrained situation mainly faces the issue of underutilization and wastage of resources leading to lower profit realization. The following findings were identified to overcome the unconstrained resource situation such as identifying the work front, adopting pull planning approach, creating a common resource pool, and allotting it on a rental basis. On the contrary, resource-constrained situation faces the issues of prioritization of resources, coordination, communication, collaboration, quality issues, and rework. The findings suggest the strategies such as top-up via subcontracting, proactive pull planning, introducing buffers, training the culture of the organization towards better communication, coordination, and collaboration, to improve the reliability of achieving baseline project performances. Various multiproject aspects suggested for effective management. The identified problems, practices, and various multiproject aspects are expected to contribute better management of multiproject resource unconstrained and constrained project scheduling.
机译:建筑公司同时执行许多项目。在这种情况下,一个项目的绩效可能对其他项目产生积极或消极的影响。在资源有限的情况下,建筑专业人员在管理多个项目时面临困难。本研究的目的是从从业者的角度识别多项目计划中的问题,并发现在资源不受约束和受约束的环境下的当前实践。具体目标是(1)确定在处理多项目环境中面临的最具挑战性的问题,(2)列举行业中采用的实践,最后(3)确定从业者对多项目调度方面的看法,例如网络建模方法;活动执行模式;共享,专用和替代资源的概念;集中和分散决策模型;解决方法;以及工具和技术。为了解决上述目标,进行了在线问卷调查。确定了在管理多项目环境中面临的首要挑战。因子分析通过将变量(a)与决策相关,(b)与项目环境相关,(c)与项目管理相关,以及(d)与组织相关的因素进行分组来识别因素。资源不受约束的情况主要面临资源利用不足和浪费,导致利润实现较低的问题。确定了以下发现以克服不受限制的资源状况,例如确定工作面,采用拉动计划方法,创建公共资源库并按租金分配。相反,资源受限的情况面临着资源优先级,协调,沟通,协作,质量问题和返工的问题。调查结果提出了诸如通过分包充值,主动拉动计划,引入缓冲,培训组织的文化以促进更好的沟通,协调和协作等策略,以提高实现基准项目绩效的可靠性。建议对多项目的各个方面进行有效管理。所识别的问题,实践和多项目方面将有望更好地管理不受约束和受约束的项目进度的多项目资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号