...
首页> 外文期刊>Advances in civil engineering >Impact of High-Rise Buildings Construction Process on Adjacent Tunnels
【24h】

Impact of High-Rise Buildings Construction Process on Adjacent Tunnels

机译:高层建筑施工过程对邻近隧道的影响

获取原文
获取原文并翻译 | 示例
           

摘要

The demand for buildings constructed along subway lines is increasing, and analysis of the impact of foundation excavation and building construction on adjacent tunnels is critical. This study investigated the variation law of tunnel deformation and surrounding earth pressure on an existing tunnel resulting from deep foundation excavation and the load of buildings. Four groups of scale model tests and corresponding numerical simulation calculations were conducted in four different modes: over unloading-loading, shallow-side unloading-loading, middle-side unloading-loading, and deep-side unloading-loading, which are according to the different relative position of the foundation pit and the tunnel. The results show that when the tunnel stretches across different areas, corresponding deformation occurs owing to the different mechanical mechanisms during excavation and loading. The results can provide evidence for the further study on the impact of adjacent construction process on the tunnels.
机译:对沿地铁线建造的建筑物的需求正在增加,分析基础开挖和建筑物对相邻隧道的影响至关重要。本研究探讨了因深基坑开挖和建筑物荷载而导致的既有隧道的隧道变形和周围土压力的变化规律。根据四种不同的模式,以四种不同的模式进行了四组比例模型测试和相应的数值模拟计算:过卸载,浅侧卸载,中侧卸载和深侧卸载。基坑和隧道的相对位置不同。结果表明,当隧道跨过不同区域时,由于开挖和加载过程中力学机制的不同,会发生相应的变形。研究结果可为进一步研究邻近施工过程对隧道的影响提供依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号