首页> 外文期刊>Ad hoc networks >Maximizing the link throughput between smart meters and aggregators as secondary users under power and outage constraints
【24h】

Maximizing the link throughput between smart meters and aggregators as secondary users under power and outage constraints

机译:在断电和断电的限制下,最大化作为辅助用户的智能电表和聚合器之间的链路吞吐量

获取原文
获取原文并翻译 | 示例
           

摘要

This paper assesses the communication link from smart meters to aggregators as (unlicensed) secondary users that transmit their data over the (licensed) primary uplink channel. The proposed scenario assumes: (i) meters' and aggregators' positions are fixed so highly directional antennas are employed, (ii) secondary users transmit with limited power in relation to the primary, (iii) meters' transmissions are coordinated to avoid packet collisions, and (iv) the secondary links' robustness is guaranteed by an outage constraint. Under these assumptions, the interference caused by secondary users in both primary (base-stations) and other secondary users can be neglected. As unlicensed users, however, meter-aggregator links do experience interference from the mobile users of the primary network, whose positions and traffic activity are unknown. To cope with this uncertainty, we model the mobile users spatial distribution as a Poisson point process. We then derive a closed-form solution for the maximum achievable throughput with respect to a reference secondary link subject to transmit power and outage constraints. Our numerical results illustrate the effects of such constraints on the optimal throughput, evincing that more frequent outage events improve the system performance in the scenario under study. We also show that relatively high outage probabilities have little effect on the reconstruction of the average power demand curve that is transmitted from the smart meter to the aggregator. (C) 2015 Elsevier B.V. All rights reserved.
机译:本文评估了从智能电表到作为(非许可)次要用户(通过(许可))主上行链路信道传输数据的聚合器的通信链路。提出的方案假设:(i)电表和聚合器的位置是固定的,因此采用了高度定向的天线;(ii)次用户相对于主要用户以有限的功率进行传输;(iii)电表的传输被协调以避免数据包冲突,以及(iv)中断约束保证了辅助链接的健壮性。在这些假设下,可以忽略由主要用户(基站)中的次要用户和其他次要用户造成的干扰。但是,作为无执照的用户,计费器-聚合器链路确实会受到主网络的移动用户的干扰,这些用户的位置和流量活动未知。为了应对这种不确定性,我们将移动用户的空间分布建模为泊松点过程。然后,我们针对受发射功率和中断约束的参考辅助链路,得出最大可实现吞吐量的封闭式解决方案。我们的数值结果说明了这些约束对最佳吞吐量的影响,表明在研究中的场景中,更频繁的中断事件可以改善系统性能。我们还表明,相对较高的停电概率对从智能电表传输到聚合器的平均功率需求曲线的重构影响很小。 (C)2015 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号