...
首页> 外文期刊>Acta Geotechnica >Numerical investigation of soil plugging inside open-ended piles with respect to the installation method
【24h】

Numerical investigation of soil plugging inside open-ended piles with respect to the installation method

机译:关于开放式桩内土塞的数值研究

获取原文
获取原文并翻译 | 示例

摘要

The development of a soil plug inside an open-ended pile with respect to the installation method is examined using numerical simulations. In this paper, the penetration process of an open-ended tubular pile with diameter D = 61 cm into granular soil is investigated. The aim is to achieve a better understanding of the mechanisms of soil plugging inside open-ended piles with respect to the installation method. As an example, the horizontal stress distribution inside the tubular pile after installation shows significant increase depending on the installation method. The numerical results are compared to experimental data.
机译:使用数值模拟检查了开放式桩内土塞相对于安装方法的发展。本文研究了直径为D = 61 cm的开口管桩在颗粒状土壤中的渗透过程。目的是相对于安装方法更好地理解开口桩内部的土壤堵塞机理。例如,根据安装方法的不同,安装后管状桩内部的水平应力分布会显着增加。将数值结果与实验数据进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号