首页> 外文期刊>ACR news >Lifetime efficiency under control
【24h】

Lifetime efficiency under control

机译:终生效率得到控制

获取原文
获取原文并翻译 | 示例
           

摘要

10-80-10: The approximate percentage costs of a building at three key stages of its life: construction; operation and decommissioning. That 80% figure is what it costs to own, occupy and maintain a building, and it is an enormous sum. Of that amount approximately another 80% is the cost of running the building services: air conditioning, heating, ventilating, lighting. Unfortunately, the construction industry is such that we put a tremendous amount of emphasis on reducing that first 10% - the capital costs. This is often to the detriment of long-term operational efficiency. From a building controls point of view, this is an especially important question. So often, BCIA members tell us, the controls are subject to cut-backs at the specification and design stages. Saving money on what may seem like 'small' items such as sensors and actuators is viewed as an almost consequence-free method to minimise that initial 10%.
机译:10-80-10:建筑物在其生命的三个关键阶段的大致成本百分比:运行和退役。这80%的数字是拥有,占用和维护建筑物的成本,这是一笔巨大的数目。在这笔费用中,约有80%是运行建筑物服务的费用:空调,暖气,通风,照明。不幸的是,建筑行业是如此,我们非常重视降低前10%的资金成本。这通常会损害长期的运营效率。从建筑物控制的角度来看,这是一个特别重要的问题。 BCIA成员经常告诉我们,控件在规格和设计阶段会受到削减。为看似“小的”物品(例如传感器和执行器)省钱被认为是将最初的10%最小化的一种几乎没有结果的方法。

著录项

  • 来源
    《ACR news》 |2015年第3期|28-29|共2页
  • 作者

    Steve Harrison;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号