首页> 外文期刊>Acoustics bulletin >Wind turbine noise - progress to date, and where to next?
【24h】

Wind turbine noise - progress to date, and where to next?

机译:风力发电机的噪音-迄今为止的进展以及下一步?

获取原文
获取原文并翻译 | 示例
       

摘要

In the UK, noise assessments for wind farm developments are undertaken using the methodology set out in ETSU-R-97 "The Assessment & Rating of Noise from Wind Farms' published in September 1996. The Government's Department of Energy and Climate Change (DECC), which has policy responsibility for ETSU-R-97, commissioned a report in 2010 to analyse how noise impacts are considered in the determination of wind farm planning applications, and specifically look at how the ETSU-R-97 methodology was being applied. The Hayes McKenzie Partnership (HMP) undertook the study, and reported back in April 2011. The HMP report highlighted variations and aspects of the methodology that in practice were being misunderstood and incorrectly applied, leading to confusion and uncertainty in the planning process.
机译:在英国,风电场发展的噪声评估是采用1996年9月发布的ETSU-R-97“风电场噪声评估与评级”中规定的方法进行的。政府能源与气候变化部(DECC)负责ETSU-R-97的政策部门于2010年委托撰写了一份报告,以分析在确定风电场规划应用程序时如何考虑噪声影响,并专门研究如何使用ETSU-R-97方法。 Hayes McKenzie Partnership(HMP)进行了这项研究,并于2011年4月进行了报告。HMP报告强调了在实践中被误解和错误使用的方法的变化和方面,从而导致规划过程中的混乱和不确定性。

著录项

  • 来源
    《Acoustics bulletin》 |2015年第2期|42-45|共4页
  • 作者

    Richard Perkins;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 03:09:24

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号