...
首页> 外文期刊>Accreditation and Quality Assurance >Ensuring the potential for an intended quality of a measurement result must be done before and during the measurement, not after it (when it is too late)
【24h】

Ensuring the potential for an intended quality of a measurement result must be done before and during the measurement, not after it (when it is too late)

机译:确保在测量之前和期间而不是之后(如果为时已晚),必须确保测量结果具有预期的质量

获取原文
获取原文并翻译 | 示例

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号