首页> 美国卫生研究院文献>Wiley-Blackwell Online Open >Modeling of subglacial hydrological development following rapid supraglacial lake drainage
【2h】

Modeling of subglacial hydrological development following rapid supraglacial lake drainage

机译:冰川湖上快速排水后的冰川下水文发展模拟

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The rapid drainage of supraglacial lakes injects substantial volumes of water to the bed of the Greenland ice sheet over short timescales. The effect of these water pulses on the development of basal hydrological systems is largely unknown. To address this, we develop a lake drainage model incorporating both (1) a subglacial radial flux element driven by elastic hydraulic jacking and (2) downstream drainage through a linked channelized and distributed system. Here we present the model and examine whether substantial, efficient subglacial channels can form during or following lake drainage events and their effect on the water pressure in the surrounding distributed system. We force the model with field data from a lake drainage site, 70 km from the terminus of Russell Glacier in West Greenland. The model outputs suggest that efficient subglacial channels do not readily form in the vicinity of the lake during rapid drainage and instead water is evacuated primarily by a transient turbulent sheet and the distributed system. Following lake drainage, channels grow but are not large enough to reduce the water pressure in the surrounding distributed system, unless preexisting channels are present throughout the domain. Our results have implications for the analysis of subglacial hydrological systems in regions where rapid lake drainage provides the primary mechanism for surface-to-bed connections.Key Points class="unordered" style="list-style-type:disc">Model for subglacial hydrological analysis of rapid lake drainage eventsLimited subglacial channel growth during and following rapid lake drainagePersistence of distributed drainage in inland areas where channel growth is limited
机译:冰川湖的快速排水在短时间内向格陵兰冰盖的河床注入了大量的水。这些水脉冲对基础水文系统发展的影响在很大程度上是未知的。为了解决这个问题,我们开发了一个湖泊排水模型,该模型结合了(1)由弹性液压顶进驱动的冰川下径流要素和(2)通过链接的通道化和分布式系统进行的下游排水。在这里,我们介绍该模型并检查在湖泊排水事件期间或之后是否会形成大量有效的冰川下通道,以及它们对周围分布式系统中水压的影响。我们使用来自西格陵兰罗素冰川终点站70公里的湖泊排水点的现场数据来强制模型。模型输出表明,在快速排水过程中,湖附近不易形成有效的冰川下通道,取而代之的是主要通过瞬态湍流片和分布式系统将水排空。湖泊排干水之后,河道会增加,但不会足够大以降低周围分布系统中的水压,除非整个域中都存在预先存在的河道。我们的研究结果对于快速湖泊排水为地表-河床联系提供主要机制的地区的冰河水文系统分析具有重要意义。要点 class =“ unordered” style =“ list-style-type:disc”> <!-list-behavior =无序前缀-word = mark-type = disc max-label-size = 0-> 快速湖泊排水事件的冰河下水文分析模型 有限的冰下湖泊快速排水过程中及之后的河道增长 河道增长受限的内陆地区持续存在分布式排水

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号