首页> 美国卫生研究院文献>Quality in Health Care : QHC >Setting up improvement projects in small scale primary care practices: feasibility of a model for continuous quality improvement
【2h】

Setting up improvement projects in small scale primary care practices: feasibility of a model for continuous quality improvement

机译:在小规模初级保健实践中建立改进项目:持续质量改进模型的可行性

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

OBJECTIVES: To evaluate the feasibility of a model for continuous quality improvement in small scale general practice and the improvement projects that practices ran after the introduction of continuous quality improvement. DESIGN: A descriptive study. SETTING: Twenty general practices in the Netherlands tested the model in an intervention period of 18 months. INTERVENTION: A model for continuous quality improvement adapted for general practice was introduced into the practices using a structured strategy. Practices were supported by trained facilitators. MAIN OUTCOME MEASURES: Acceptance at introduction and continued application of the model; the topics of improvement projects that were set up in the practices; whether the improvement projects had been completed; whether they had met the criteria (the use of the "quality cycle" and the Oxford audit score); and whether the self set objectives had been met. RESULTS: The model was introduced and accepted in all participating practices. Practices started 51 improvement projects. At the end of the study period 33 improvement projects had been completed. Practices chose a wide variety of objectives for these projects; most of them concerned medical or organisational topics. Practices started projects mainly because the topic was felt to be a problem or was causing a bottleneck in the organisation. The quality cycle was used in all projects, but practices did not always collect data and evaluate the outcomes. Fourteen projects could be discerned as "full audit". No differences existed in the quality of improvement projects among the various types of practice or between the topics addressed. At the end of the study period half of the practices continued applying the model. CONCLUSION: This study showed that the model was feasible for small scale general practice. However, application of the model tended to disintegrate after the facilitator had left the practice. Practices succeeded reasonably well in running improvement projects. Introduction of continuous quality improvement should particularly focus on this. It is suggested that intensive support is necessary to implement and maintain continuous quality improvement in small scale practices.
机译:目的:评估在小规模通用实践中进行持续质量改进的模型以及在引入持续质量改进之后实施的改进项目的可行性。设计:描述性研究。地点:荷兰的20种常规做法在18个月的干预期内对该模型进行了测试。干预:采用结构化策略将适用于一般实践的持续质量改进模型引入实践中。实践得到了训练有素的主持人的支持。主要观察指标:在模型引入和继续应用中接受;实践中建立的改进项目的主题;改善工程是否已完成;他们是否符合标准(使用“质量周期”和牛津大学审核分数);以及是否达到了自我设定的目标。结果:该模型已被所有参与实践引入并接受。实践开始了51个改进项目。在研究期末,完成了33个改进项目。实践选择了各种各样这些项目的目标;他们大多数涉及医疗或组织主题。实践启动项目主要是因为主题被认为是一个问题或正在导致组织的瓶颈。质量周期已在所有项目中使用,但实践并非总是如此收集数据并评估结果。可能有十四个项目被视为“全面审核”。在质量上没有差异各种实践之间或之间的改进项目解决的主题。在研究期结束时,一半的练习继续应用模型。结论:本研究表明该模型对于小规模的通用实践是可行的。但是,应用主持人离开练习后,该模型趋于瓦解。实践在运行改进项目方面相当成功。引入持续质量改进应特别关注这个。建议需要大力支持来实施和实施在小规模实践中保持持续的质量改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号