首页> 美国卫生研究院文献>other >Modelling Ephemeral Gully Erosion from Unpaved Urban Roads: Equifinality and Implications for Scenario Analysis
【2h】

Modelling Ephemeral Gully Erosion from Unpaved Urban Roads: Equifinality and Implications for Scenario Analysis

机译:从未铺设的城市道路模拟临时沟壑侵蚀:等式性和方案分析的含义

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Modelling gully erosion in urban areas is challenging due to difficulties with equifinality and parameter identification, which complicates quantification of management impacts on runoff and sediment production. We calibrated a model (AnnAGNPS) of an ephemeral gully network that formed on unpaved roads following a storm event in an urban watershed (0.2 km2) in Tijuana, Mexico. Latin hypercube sampling was used to create 500 parameter ensembles. Modelled sediment load was most sensitive to the Soil Conservation Service (SCS) curve number, tillage depth (Td), and critical shear stress (τc). Twenty-one parameter ensembles gave acceptable error (behavioural models), though changes in parameters governing runoff generation (SCS curve number, Manning’s n) were compensated by changes in parameters describing soil properties (TD, τc, resulting in uncertainty in the optimal parameter values. The most suitable parameter combinations or “behavioural models” were used to evaluate uncertainty under management scenarios. Paving the roads increased runoff by 146–227%, increased peak discharge by 178–575%, and decreased sediment load by 90–94% depending on the ensemble. The method can be used in other watersheds to simulate runoff and gully erosion, to quantify the uncertainty of model-estimated impacts of management activities on runoff and erosion, and to suggest critical field measurements to reduce uncertainties in complex urban environments.
机译:由于等度性和参数识别的困难,对城市地区的沟壑侵蚀进行建模具有挑战性,这使管理对径流和泥沙产生的影响量化变得复杂。我们校准了在墨西哥蒂华纳的一个城市分水岭(0.2 km 2 )发生暴风雨之后在未铺砌的道路上形成的临时沟壑网络的模型(AnnAGNPS)。拉丁超立方体采样用于创建500个参数合奏。模拟的泥沙负荷对土壤保护局(SCS)曲线数,耕作深度(Td)和临界切应力(τc)最敏感。 21个参数组合给出了可接受的误差(行为模型),尽管控制径流生成的参数变化(SCS曲线数,Manning的n)由描述土壤性质的参数(TD,τc)的变化所补偿,导致最优参数值的不确定性。最合适的参数组合或“行为模型”用于评估管理方案下的不确定性,铺装道路的径流量增加146-227%,峰值流量增加178-575%,泥沙负荷减少90-94%,具体取决于该方法可在其他流域中使用,以模拟径流和沟壑侵蚀,量化管理活动对径流和侵蚀的模型估计影响的不确定性,并建议关键现场测量以减少复杂城市环境中的不确定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号