首页> 美国卫生研究院文献>Malaria Journal >Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia
【2h】

Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia

机译:疟疾和水资源开发:以埃塞俄比亚的吉尔吉尔-吉贝水电大坝为例

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

BackgroundEthiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children.
机译:背景埃塞俄比亚计划在未来五年内将电力供应增加五倍,以满足人民的需求并支持大型水电大坝的经济增长。为水力发电建造大型水坝可能会增加疟疾的传播,因为它们会改变生态系统并创造新的媒介繁殖栖息地。这项研究的目的是评估埃塞俄比亚的吉尔吉尔吉贝水电站对疟疾传播和儿童患病率变化的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号