首页> 美国卫生研究院文献>Eplasty >Water Temperature From Hot Water Outlets in a Major Public Hospital: How Hot is Our Water?
【2h】

Water Temperature From Hot Water Outlets in a Major Public Hospital: How Hot is Our Water?

机译:一家大型公立医院的热水出口的水温:我们的水有多热?

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

>Objectives: To measure the water temperature issuing from a representative sample of patient-accessible outlets around the Royal Adelaide Hospital. To initiate an audit cycle in the event of unacceptably high water temperatures to ensure their reduction. >Methods: Samples were taken of water issuing from hot taps, showers, and hand hygiene basins in patient areas throughout the hospital, encompassing newly renovated as well as old sections of the hospital. A 45 second “warming” period was followed by hot water collection into a polystyrene cup to 8 cm. The mean of 3 temperatures measured using an infrared thermometer was calculated. >Results: Several taps and patient showers were demonstrated to supply water at a temperature capable of causing scald injuries. Most problem outlets were found in the oldest section of the hospital, fewer in the wing of “intermediate” age and none in the most recently renovated emergency block. The data were tabulated and summarized before being passed on to RAH Engineering and Building Services, which initiated remedial action. Several thermostatic mixing valves were found to be faulty (and replaced) or poorly set (and re-set). After this adjustment, outlets previously supplying excessively hot water were re-tested and found to be safe, closing the audit loop. >Conclusion: Maintenance services infrequently conduct scheduled assessment of hot water outlet temperatures and rely on staff member complaints or concerns to focus their attention on problem areas. With recent evidence of the disastrous potential of hot water on a vulnerable population of hospital in-patients, hazard identification and reporting is everybody's responsibility.
机译:>目标:要测量皇家阿德莱德医院周围有代表性的患者可及场所的水温。在水温过高时启动审核周期,以确保降低水温。 >方法:采样是从整个医院患者区域的热水龙头,淋浴器和手部卫生盆中抽取的水,这些区域包括新近装修的医院和旧的医院。 45秒钟的“加温”期后,将热水收集到8厘米的聚苯乙烯杯中。计算使用红外线温度计测得的3个温度的平均值。 >结果:展示了数个水龙头和病人淋浴可以在一定温度下供水,能够造成烫伤。大多数问题点位于医院最老的区域,在“中级”年龄段很少,而在最近翻新的急诊区则没有。将数据制成表格并进行汇总,然后再传递给RAH工程与建筑服务部,由其发起补救行动。发现几个恒温混合阀出现故障(并已更换)或设置不当(并已重新设置)。进行此调整后,对先前供应过高热水的出口进行了重新测试,发现它们是安全的,从而关闭了审核循环。 >结论:维护服务很少定期对热水出口温度进行评估,并依靠工作人员的投诉或关注将他们的注意力集中在问题区域。最近有证据表明热水对医院住院患者的脆弱人群造成灾难性的后果,危害识别和报告是每个人的责任。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号