首页> 美国卫生研究院文献>Health Promotion Perspectives >Prioritizing Public- Private Partnership Models for Public Hospitals of Iran Based on Performance Indicators
【2h】

Prioritizing Public- Private Partnership Models for Public Hospitals of Iran Based on Performance Indicators

机译:根据绩效指标优先考虑伊朗公立医院的公私合作模式

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

>Background: The present study was conducted to scrutinize Public- Private Partnership (PPP) models in public hospitals of different countries based on performance indicators in order to se-lect appropriated models for Iran hospitals. >Methods: In this mixed (quantitative-qualitative) study, systematic review and expert panel has been done to identify varied models of PPP as well as performance indicators. In the second step we prioritized performance indicator and PPP models based on selected performance indicators by Analytical Hierarchy process (AHP) technique. The data were analyzed by Excel 2007 and Expert Choice11 software’s. >Results: In quality – effectiveness area, indicators like the rate of hospital infections (100%), hospital accidents prevalence rate (73%), pure rate of hospital mortality (63%), patient satisfaction percentage (53%), in accessibility equity area indicators such as average inpatient waiting time (100%) and average outpatient waiting time (74%), and in financial – efficiency area, indicators including average length of stay (100%), bed occupation ratio (99%), specific income to total cost ratio (97%) have been chosen to be the most key performance indicators. In the pri¬oritization of the PPP models clinical outsourcing, management, privatization, BOO (build, own, operate) and non-clinical outsourcing models, achieved high priority for various performance in¬dicator areas. >Conclusion: This study had been provided the most common PPP options in the field of public hospitals and had gathered suitable evidences from experts for choosing appropriate PPP option for public hospitals. Effect of private sector presence in public hospital performance, based on which PPP options undertaken, will be different.
机译:>背景:本研究旨在根据绩效指标对不同国家公立医院的公私合营(PPP)模式进行审查,以选择适用于伊朗医院的模型。 >方法:在这项混合(定量-定性)研究中,已经进行了系统的审查和专家小组讨论,以识别PPP的各种模型以及绩效指标。在第二步中,我们通过分析层次过程(AHP)技术根据选定的性能指标对性能指标和PPP模型进行了优先排序。数据通过Excel 2007和Expert Choice11软件进行了分析。 >结果:在质量-有效性方面,指标包括医院感染率(100%),医院事故患病率(73%),医院纯死亡率(63%),患者满意度( 53%),在可访问性平等区域指标(例如平均住院等待时间(100%)和平均门诊等待时间(74%)),在财务效率区域,指标包括平均住院时间(100%),床位占用率(99%),特定收入占总成本的比例(97%)被选为最关键的绩效指标。在PPP模型的优先排序中,临床外包,管理,私有化,BOO(构建,拥有,运营)和非临床外包模型在各种性能指标领域都获得了高度优先。 >结论:该研究为公立医院提供了最常见的PPP选择,并从专家那里收集了适当的证据,为公立医院选择合适的PPP选择。根据所采取的购买力平价方案,私营部门的存在对公立医院绩效的影响将有所不同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号