首页> 美国卫生研究院文献>International Journal of Environmental Research and Public Health >The Effects of Data Collection Method and Monitoring of Workers’ Behavior on the Generation of Demolition Waste
【2h】

The Effects of Data Collection Method and Monitoring of Workers’ Behavior on the Generation of Demolition Waste

机译:数据收集方法和工人行为监测对拆除废物产生的影响

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The roles of both the data collection method (including proper classification) and the behavior of workers on the generation of demolition waste (DW) are important. By analyzing the effect of the data collection method used to estimate DW, and by investigating how workers’ behavior can affect the total amount of DW generated during an actual demolition process, it was possible to identify strategies that could improve the prediction of DW. Therefore, this study surveyed demolition waste generation rates (DWGRs) for different types of building by conducting on-site surveys immediately before demolition in order to collect adequate and reliable data. In addition, the effects of DW management strategies and of monitoring the behavior of workers on the actual generation of DW were analyzed. The results showed that when monitoring was implemented, the estimates of DW obtained from the DWGRs that were surveyed immediately before demolition and the actual quantities of DW reported by the demolition contractors had an error rate of 0.63% when the results were compared. Therefore, this study has shown that the proper data collection method (i.e., data were collected immediately before demolition) applied in this paper and monitoring on the demolition site have a significant impact on waste generation.
机译:数据收集方法(包括适当的分类)的作用以及工人在拆迁废料(DW)产生上的行为均很重要。通过分析用于估计DW的数据收集方法的效果,并研究工人的行为如何影响实际拆除过程中产生的DW总量,可以找到可以改善DW预测的策略。因此,本研究通过在拆除之前立即进行现场调查,以调查不同类型建筑物的拆除废物产生率(DWGR),以收集足够而可靠的数据。此外,还分析了DW管理策略和监控工人行为对DW实际生成的影响。结果表明,在实施监测时,从拆迁前进行调查的DWGR获得的DW估计值与拆迁承包商报告的DW实际数量进行比较时的错误率为0.63%。因此,这项研究表明,本文采用了正确的数据收集方法(即在拆除之前立即收集了数据)并在拆除现场进行监控对废物产生有重大影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号