沪通长江大桥跨横港沙112m简支钢桁梁全悬臂架设安装技术

         

摘要

The part of the Hutong changjiang River Bridge crossing the Henggangsha shallow water area is a steel truss girder structure formed of three truss blocks, arranged in 21 spans, each 112 m long.The steel truss sections in the first span were erected by using scaffoldings, the remaining spans were erected by full-cantilever assembly, and the system was transformed from a continuous to a simply-supported structure.The high stress problem in the top zone of the continuous piers was effectively reduced by taking several measures, including optimizing the way of mounting the truss blocks on pier tops, installing the highway stringers later, placing two rows of supports on the top of the continuous piers, and the construction risk was also effectively reduced.The transverse restriction devices on the top of the continuous piers and longitudinal restriction devices on the pier top were installed to ensure the transverse stability when the bridge was in the large cantilever state or attacked by the abrupt wind or typhoon.%沪通长江大桥横港沙浅水区域桥梁上部结构为21孔112 m简支三主桁钢桁梁,采用"首跨膺架法搭设、其余跨全悬臂拼装、先连续后简支"的安装方法.通过采取优化上墩方式、公路纵梁后安装、连续墩墩顶设置双排支撑等措施,减小了钢桁梁在大悬臂施工条件连续墩墩顶区域应力偏高问题,有效地降低了施工风险.通过采取在连续墩墩顶设置横向限位装置、在墩顶设置纵向限位装置等措施,确保钢梁大悬臂状态下遭遇突风或台风时的横向稳定性.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号