在总结黄河上游水电工程建设施工经验的基础上,制定了积石峡水电站免装修清水混凝土的工程质量标准,论述了施工工艺控制要点及参建各方应采取的技术措施,确保了免装修清水混凝土质量控制目标的实现.%Based on the construction experiences of hydropower stations in upper reaches of Yellow River, the quality standard of as-cast finish concrete construction in Jishixia Hydropower Station is developed. The keys of as-cast finish concrete construction technology and relating measures are introduced herein. The practices show that the quality of as-cast finish concrete is guaranteed.
展开▼