摘要

三峡地下电站引水隧洞上弯段属高速高压水流区,对衬砌混凝土质量要求高,空间结构特殊,施工难度大,因此提出采用新型隧洞双曲钢模台车进行衬砌施工的方案.根据台车的浇筑顺序,采用现场测量与有限元仿真相结合的方法对台车的变形进行研究,了解其变形量,变形发展趋势和规律,保障施工质量和安全,为同类型钢模台车设计提供一线数据.%Because the flow in the upper bend section of diversion tunnel for Three Gorges Underground Power Station is fast, the requirements on lining concrete quality are strict, at the same time, the construction of the section is difficult as its special spatial structure. A kind of new hyperbolic steel trolley is used in the lining construction. For understanding the deformation of trolley and keeping the construction quality, the deformation is studied by combining the field measurement and finite element simulation according to the pouring sequence. The study can provide reference data to the design of similar steel trolley.

著录项

  • 来源
    《水力发电》 |2011年第7期|31-33|共3页
  • 作者单位

    三峡大学机械与材料学院;

    湖北宜昌443002;

    三峡大学机械与材料学院;

    湖北宜昌443002;

    特变电工衡阳变压器有限公司;

    湖南衡阳421007;

    三峡大学机械与材料学院;

    湖北宜昌443002;

    三峡大学机械与材料学院;

    湖北宜昌443002;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 TV554(263);
  • 关键词

    双曲钢模台车; 施工现场; 变形; 三峡电站;

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号