龙开口水电站坝基深槽处理设计

         

摘要

During the excavation of dam foundation in Longkaikou Hydropower Station, a wide deep trench is found in original main riverbed. The deep trench has complex geometry and cuts through entire dam foundation along the river's direction. Its treatment is extremely difficult. The treatment plan of constructing reinforced concrete bearing plate covering the deep trench and backfilling trench with concrete after trench excavation is suggested. The plan can guarantee the simultaneous construction of deep trench treatment and dam concrete pouring, and minimize the influence on the straight line duration of spillway construction. This plan makes the power generation of first hydro-generator nine-months earlier than other conventional treatment schemes.%龙开口水电站施工过程中,发现原主河床存在较大规模的深槽.该深槽形态复杂,顺河向斜穿整个坝基,处理难度极大.采用跨深槽布置钢筋混凝土承载板与槽挖回填混凝土全置换方案,深槽处理与坝体混凝土同步施工,尽可能减少对泄洪坝段直线工期的影响,较常规处理方案提前发电时间约9个月.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号