To prevent the collisions between cable cranes, gate towers and other construction machineries during operation, the anti-collision system is applied in the construction of Longkaikou Hydropower Station. The design concept, system structure, program development and precision selection of anti-collision system are introduced herein. This system is able to alarm and control the positions and velocities of cable cranes and gate towers. There is no any collision accident happened in the construction of project since the system is used, and the safety of construction is effectively guaranteed.%为防止缆机、门塔机等施工机械在运行中发生碰撞,龙开口水电站在施工中采用了防碰撞系统.对龙开口水电站大坝施工防碰撞系统的设计理念、系统构成、程序开发、精度选择等进行了详细的阐述.该系统能够对缆机运行与门塔机运行位置、速度等进行报警和控制,在正常运行期间未发生一起机械碰撞事故,有效地保障了施工建设安全.