结合卡普斯浪二级水电站工程,对水轮机蜗壳外围混凝土进行受力分析、配筋计算和探讨,供同类中、小型水电站参考。%Take the project of the Second Hydropower Station on Kapusilang River for example, the force analysis and reinforcement calculation for concrete structure surrounding the spiral case are dis-cussed in this article, just a reference for similar projects.
展开▼