Though the pouring belt construction, reinforced c-oncrete structure construction large can block, and then throu-gh the casting deformation joint the entire structure is connect-ed as a whole, this kind technology would speed up the constr-uction schedule. In this paper, through the analysis of the main function of the post pouring belt, and specific problems encou-ntered in the post cast band construction, it explores the main technology of post casting band establishment and construction.%通过后浇带施工,大型的钢筋混凝土结构可以分块进行施工,然后通过浇筑变形缝将整个结构连接成为一个统一的整体,这种技术加快了建筑施工的进度。本文通过分析后浇带的主要功能,以及后浇带设置施工中遇到的具体问题,并探究后浇带设置和施工的主要技术。
展开▼