首页> 中文期刊> 《城市建筑》 >有关隧道工程施工超挖的预防与控制的分析

有关隧道工程施工超挖的预防与控制的分析

         

摘要

In the new period, the construction technology and technological level of tunnel engineering in China has greatly improved, greatly improved the status of the tunnel constructi-on, building many good performance of the tunnel for the dev-elopment of the country. However, the phenomenon of overbr-eak stil serious in tunneling current, become the main factor a-ffecting the safety accidents evoked quality, tunnel, must be s-olved effectively. The paper taking the overbreak phenomenon of tunnel as the theme, through the analysis of induced factors of overbreak phenomenon, talked about the prevention and co-ntrol ing measures of overbreak phenomenon.%  新时期,我国隧道工程的施工技术与工艺水平实现了大幅度的提升,极大地改进了隧道工程的建设状况,为国家发展建造了诸多良好性能的隧道。但是,超挖现象在当前的隧道施工中依然较为严重,成为影响隧道质量、诱发安全事故的主要因素,必须得到有效地解决。本文以隧道的超挖现象为主题,通过分析诱发超挖现象的因素,谈论了对超挖现象进行预防及控制的具体措施。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号