轨道交通工程施工现场安全模糊综合评价

         

摘要

在分析轨道交通工程施工特点的基础上,结合JGJ/T 77 - 2003《施工企业安全生产评价标准》,建立了安全评价指标体系,并运用模糊层次分析法对某市轨道交通1号线8个标段项目部的施工安全进行了全面评价.安全评价结果为较安全.%Based on an analysis of the characteristics of rail transit construction, a scientific and reasonable safety evaluation system combined with "Standards on Safety Assessment for Construction Companies" (JGJ/ T 77 - 2003) is sets up. The Fuzzy AHP method is also applied in the comprehensive evaluation of 8 bid sections of metro Line 1 in some a city, and the evaluation results show that all the section of the engineering are in good condition. The practice proves that the Fuzzy AHP method is feasible to evaluate the safety on rail transit construction spot and could achieve good effects.