This paper to Yili autonomous prefecture GuoZiGou cable-stayed bridge of the tower construction Z2 # as an example,the detailed description of the tower in the tower,the characteristics of asynchronous construction beam to the construction of the measurement of monitoring and measurement lofting combined,thereby improving job process,improve work efficiency,and to ensure the accuracy of the construction of the tower.%对新疆伊犁自治州果子沟斜拉桥Z2#主塔施工中针对主塔进行塔梁异步施工的特点,将施工中的测量监控与测量放样结合起来,从而改进工作流程,提高工作效率,确保主塔施工精度。
展开▼