This paper determines the conditions for upgrading and reconstruction of electromechanical equipment by means of the fuzzy evaluation method and in comprehensive consideration of factors such as service life, failure rate, operating environment, importance, maintenance cost/difficulty, etc. of electromechanical equipment for expressway,and proposes the corresponding upgrading and reconstruction schemes to reduce the operating cost of electromechanical equipment for expressway effectively,improve the operating reliability and add trouble-free operation time.%运用模糊评价法,综合考虑高速公路机电设备的使用寿命、故障率、工作环境、重要性、维护成本和难度等因素确定其升级改造条件,并提出相应的升级改造方案,以有效降低高速公路机电系统的运营成本,提高运行可靠性,增加无故障运营时间.
展开▼