This paper introduces the investigation of Pingtan strait bridge over sea which is blowy and larger tidal. One advanced technology,which is retrievable casing, can overcome some difficulty in sea ar-ea drilling,such as shaked drilling ships,large-scale tidal range,and so on, it can improve work efficiency significantly,promote safety production,and provide powerful guarantee for finishing the engineering. This paper can also provide reference for other similar projects.%该文介绍了在风大浪急且有较大潮差的平潭海峡跨海大桥勘察中,应用活动套管这一先进工艺,成功克服了海域钻探船舶晃动严重、潮差大等困难,显著提高了工作效率,促进了安全生产,为顺利完成该项目提供了有力保障。该文也可为其它类似工程提供借鉴作用。
展开▼