首页> 外文期刊>川崎製鉄技報 >Design, Fabrication and Erection of the Stiffening Girder of 3rd Kurushima Kaikyo Bridge -World's First Three-linked Suspension Bridges with Stiffening Box Girder of Over 1000m Long-
【24h】

Design, Fabrication and Erection of the Stiffening Girder of 3rd Kurushima Kaikyo Bridge -World's First Three-linked Suspension Bridges with Stiffening Box Girder of Over 1000m Long-

机译:世界第三座长超过1000m的加劲箱梁的三座悬臂海峡大桥-第三座库鲁岛海峡大桥的加劲梁的设计,制造和安装-

获取原文
获取原文并翻译 | 示例
       

摘要

Kurushima Kaikyo Bridge, which consists of three bridges crossing the Kurushima Strait located within Seto Inland Sea National Park, is the first three-linked suspen- sion bridge in the world. Many advanced technologies Were adopted in the construction of the bridges. Espe- Cially, the introduction of a newly-developed self-position- Ing barge and a quick-joint-system enabled to install shop- Fabricated stiffening box girders merely in 30 min by Means of a direct hoisting method.
机译:濑户内海国家公园内的三座跨过九岛海峡的桥梁组成的九岛海峡大桥是世界上第一座三链悬索桥。桥梁的建造采用了许多先进的技术。尤其是,引进了新开发的自定位Ing驳船和快速接头系统,从而可以通过直接提升的方式仅在30分钟内安装车间制造的加劲箱梁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号