Taking the specific project as an example,the mechanism of the landslide is studied,determining the shape of anti-slide pile and designing optimization. The use of large diameter artificial dig-hole pile and steel pipe pile composites pile type,effectively avoids the hard rock blasting work and densely populated areas, greatly saves the cost and time limit for a project. Through the landslide monitoring and verification of the late,the anti-slide pile has obtained the good effect,played a role as a reference for similar projects.%以具体工程为实例,从滑坡发生的机理进行分析,确定抗滑桩的形式并进行设计优化,采用大直径人工挖孔桩和钢管桩组合桩型,有效地避免了硬质岩石和人口密集地区的爆破工作,大大地节约了成本,缩短了工期. 通过对后期滑坡体的监测验证,该抗滑桩取得了良好的效果,对类似工程有一定的借鉴作用.